Current Location: Home>>PRODUCTS>>Soakaway crates

Contact Us

C

Qingdao Yongsen New Building Materials Co., LTD

Phone:+86 19056839023

Mobile:+86 19056839023

Email:helen@cnyongsen.com

Address:620 Huishui Road, Licang District, Qingdao

STORMWATER MANAGEMENT

  • Classification:Soakaway crates
  • Visits: 2
  • Time:2026-07-29 14:17:10
  • Detail

Stormwater management/rainwater harvesting system

1-Roof garden,

2-Roof flowerpot

3-Greening wall

4-Raiwater catch basin

5-Automatic discharging device

6-Automatic Filter device

7- Sewerage discharging basin

8-Recovery basin

9-PP infiltration tank10-Geo membrance

11-Silty Sandy Clay

12-Back-purge system

13-Recovery system

14-Irrigation system

15-Infltration collect

16-Sewerage discharging system

17-Equipment foundation

18-Total dshargsig quantiy moitoring.

1.jpg


Stormwater management

Looking for a smarter way to manage stormwater runoff on your project? The YS-Tank System provides the most efficient and versatile method of underground stormwater storage available today. It's an ideal way to convert stormwater ponds to useable space, and YS-Tank is a more efficient, space saving alternative for underground stormwater detention, infiltration, and recycling systems.

YS-Tank is a modular system and can be assembled to a variety of heights . This rigid system can be placed be-neath a variety of surfaces including: Parking Lots, Streets and Access Roads, Driveways, Landscaping, Athletic Fields/Playgrounds, Swales and Channels.

YS-Tank can be used for a variety of applications including: Retention and Infiltration, Detention, Recycling or Harvesting, Pond Retrofits, DryWells, and Bioretention.


2.jpg



Benefits:

High Capacity

95% void internal area

Strength

Easily supports traffic loading from parking lotsand roads

Backfill with sand - no stone required 

Design & Construction Versatility

Combine modules into any shape to efficientlyuse space

Increased Infiltration and Exfiltration

Outer shell is 90% open

Increases groundwater recharge, reducing post-construction discharge 

volumes

Easy to Transport

Can be supplied unassembled for reduceddelivery costs                                                            

Lightweight and Quick to Install

Installed by hand; no cranes required           

Reduces site access delays

Recycled Content                          

Manufactured with recycled polypropylene

23.jpg

ItemNo:YS-6845

Size:680x410x450mm

Material:Recycle material

Compression Strength:25-35Tons/m2

Tanks:Per unit square meter include 3-7 pcs

Void Ratio:95%


9 small pics: one pallet in 20GP

    9 small pics: One 20GP

 9 small pics:one pallet in 40HQ

 9 small pics:One 40HQ

967 pics

9670 pics

1102 pics

24244 pics

4 big pics + 1 samall pic:one pallet in 20GP

4 big pics+ 1 samall pic:One20GP

4 big pics+ 1 samall pic:one pallet in 40HQ

4 big pics+ 1 samall pic:One 40HQ

537 pics

5370 pics

612 pics

13475 pics


1.jpg

2.png

Project cases:


 



 



 




12.jpg

YS-Tank  Maintenance:

Installing the Maintenance System

To install the PCV Pipe, remove the center small plate and cut the top large plate between the remalning interior small plates. Before inserting the port into the Tank, install an anti-scour plate in the bottom of the Tank to prevent disturbance of the base materials.

Maintenance ports should be capped at the surface.In landscaped areas, this may be accomplished with a simple pipe cap or plasticvalve box. In paved areas, metal Tidsare moreappropriate.


Maintenance Intervals

Maintenance Schedules for the YS Tank System are a function of the contributing area and the type of pre-treatment specified. A standard maintenanceschedule may include quarterly inspections through the first year of use, with yearly inspections thereafter.Flushing should be performed if sediment should the lesser of 6" or 15% of the system height.


1.jpg